PROJECT SUMMARY
TECHNICAL
Double Lane with Hard Shoulder/ 32.32 Km /hardshoulder/ pavedshoulder 1.50 m and RCC drain on Paved Shoulder build up Area ( 3.14 Km ) Major Bridge :
Numbers 2.
Locations 1 12+550 Open RCC Solid Slab, 2- 27+219 RCC open Solid Slab. Minor Bridge.
Numbers 2.
Locations 1. 23+340 Open RCC RCC Deck Slab 1 x 8.00 7.60, 2 -27+553 Open RCC RCC Deck Slab 2 x 15 8.40. Culverts
Slab Culverts 2 no (3+408, 30+689).
Hume pipe Cuiverts 47. Amount of Technical Sanction Rs 8428.68 Lacs.